Modification of Moving Bolster of Press Fagor 3600 ton
Job realized in 30 days
In the process, disassembly and inspection were carried out, reinforcements were welded, cavities were machined for flash output and the faces were also machined to ensure parallelism and that the two would be the same. It was a job done in 30 days.