RETROFITING OF EUMUCO MP4000 PRESS
Excellent coordination and machine ability
There was a dimensional and physical condition inspection of the main components of the Press, in which the disassembly was carried out to later make adjustments to the crankshaft bushings, connecting rod and connecting rod bolt, and pylon guides. In the same way, there were also changes of bearings (pipe in general), bushings of the intermediate shaft assembly, shock absorbers, brake components and complete friction, and later the repair of the friction discs. And not only that, but also maintenance and assembly of the mechanical, hydraulic, pneumatic, lubrication, (electrical by TKMM) assemblies and performance tests were already carried out. Finally, the assembly and start-up of the Press was carried out and this entire process was carried out in 8 weeks.